Client Requirement
On
July 13, 2001, China’s capital Beijing was awarded the
right to host the 2008 Olympic Games. The upcoming Games
are being heralded as the ‘Green Olympics’, ‘Hi-Tech
Olympics’ and the ‘People’s Olympic Games’.
These
three concepts encapsulate the spirit of the Games and
organisers are determined that every venue erected will
be both technologically advanced and environmentally
friendly. With the eyes of the world on Beijing next
year, this initiative ensures that the detrimental
effects of stadium ‘wastage’ on the environment are
minimised.
Dynalite
was selected as the lighting control system of choice in
eight newly-built Olympic venues. This was due not only
to the unparalleled reliability and functionality of the
product, but also to a proven track record in stadia and
Olympic venue applications. |
above:
Artists
impression of Tianjing Olympic Centre |

above:
Artists
impression of Wukesong Baseball Field |
The
Dynalite Solution
All Olympic venues
being controlled by Dynalite employ switching technology
only - simple on/off control of lighting, to provide
maximum energy savings. A mix of DDRC410FR, DDRC620FR,
DDRC820FR and DDRC1210FR Relay Controllers are employed
across all eight venues. The robust ‘FR’ series of
relay controllers are designed to control any type of
switched load and the power circuit is of a "feed
through" design. This power circuit design is
electrically equivalent to a 4,6, 8 or 12-pole
contactor, with the additional advantage of each pole
being separately controllable via the DyNet network. All
of the selected relay controllers are DIN rail mountable
and designed to be installed into a switchboard, next to
the circuit breakers feeding the circuits to be
controlled.
Additionally,
the larger venues; Shenyang Olympic Sport Centre
Stadium and Tianjin Olympic Centre, employ a mix of
Dynalite network gateways and interfaces, to
facilitate integration to third party equipment, such
as Audio Visual and building management systems.
A
range of robust DLP configurable panels complete the
product offering, providing simple user control system
operation from convenient locations.
Client
Benefit
Dynalite
was the obvious choice for the Beijing 2008 Olympics
with a proven track record at numerous Sydney Olympic
sites.
The
product benefits are numerous; use of DIN rail
mountable controllers occupy a smaller footprint,
thereby reduces amount of space required for
installation. Additionally, Dynalite’s range of
DIN-rail mounted relay controllers incorporate the
amazingly robust H-armature relays, which provide
superior reliability and life. Despite the fact that
China contains a large number of local, relatively
inexpensive relay manufacturers, Dynalite has been
chosen for these important projects due the
reliability and functionality of the product and its
superior reputation worldwide.
Download 2008